We manufacture industrial kitchen equipment and stainless steel prep tables with 18 employees in Kısıkköy, İzmir. We have an old website from 2015 that breaks when viewed on smartphones. To showcase our product catalog and provide our dealer network with up-to-date technical PDFs we sat down with a digital agency for a new site.
The quote presented to us split the cost into two main lines: 40,000 TL for Web Design, and 50,000 TL for Web Coding and Integration. Total 90,000 TL + KDV. When I asked why there were two separate items instead of a single website fee, the account rep gave me a brush-off answer saying "one is the drawing and the other is the function."
When having a site built are both web design and coding strictly mandatory as separate processes? Can't one be done without the other, and what does each one actually do? Is there any way to bring these two line items and the budget down to a more reasonable level?