Agency isn't delivering the project, six months have passed — what should I do?

GGökhan A***Member
Job title
Manufacturer · furniture
Joined
Oct 2023
Message
74
#1

We manufacture furniture and had an order tracking system built. The contract said 3 months, it's been 6 and it's still not done. We've paid 70% of the money.

Every time I call, they say "it'll be done this week." Here's what happened to us: we saw two demos, both had the same missing features.

I don't know what to do now. Should I wait, go to a lawyer, or hand it over to another agency? Has anyone else been through this?

AAv. Kemal U***Expert
Job title
Lawyer · IT
Organization type
300-person organization
Joined
Sep 2023
Message
168
Most Helpful#2

First off, I'm giving general info, not legal advice; I can't give specific recommendations without seeing your file.

The first thing to do in this situation is to turn verbal follow-ups into written ones. Saying "it'll be done this week" on the phone has no evidentiary value. Summarize every subsequent meeting via email: "in today's meeting, it was stated that delivery will be made on [date]."

The second step is to check what the contract stipulates for delays. If there's a penalty clause, you usually need to put them in default first, i.e., send a proper formal notice. The content and timeline of this notice are important, don't just download a template and send it.

The third step is to secure what you have: request the delivery of the existing code, database, and design files if any. This is the most common thing lost when disputes escalate; it's much easier to ask while the relationship is still good.

If you're thinking about handing it over, this third step is essential. If you don't have working code in hand, there's no handover, just a rebuild.

MMehmet A***Expert
Job title
Agency owner
Organization type
early-stage startup
Joined
Sep 2023
Message
187
#3

Let me speak from the agency side, I won't make excuses but I'll try to diagnose the issue.

1. In the vast majority of 3-month projects that take 6 months, the reason is the same: the agency took on more work than their capacity allows, and your project got pushed back because you're the least vocal client.

The phrase "it'll be done this week" is usually not a lie, but a wish. That week another client yells and the team shifts there.

3. The most effective thing you can do is ask for weekly visibility instead of just dates. A written progress report every Friday: what was finished this week, what will be finished next week, what are the blockers. If the same thing is written two weeks in a row, you have your answer.

4. Before handing it over, definitely get a technical review. Taking over a project that's 70% paid but only 20% done is more expensive than starting from scratch. Don't make a decision without knowing this.

VVolkan A***Veteran
Job title
Software Architect
Joined
Apr 2023
Message
312
#4

I've been doing this for twenty years, and I've done many takeover reviews. Let me list what to look for, don't rush.

The first thing to check is whether the code is stored somewhere. Is version control being used, is there history? If not, that's the clearest sign the work isn't being managed properly.

Second, does it run? If the code doesn't launch on another machine when you get it, it hasn't been delivered.

Third, the database structure. Missing screens can be fixed. If the data model is wrong, you can't build on top of it, you have to tear it down.

Have someone who can assess these three things in a day look at it. A small cost for a very big decision.

TTamerMember
Job title
Service network
Organization type
two-branch business
Joined
Jul 2024
Message
78
#5

We went through the same thing. Work sped up the week we asked for written reports. Worth a try.

EEsra D***Member
Job title
SME Consultant
Joined
Feb 2024
Message
124
#6

Gökhan Bey, let me list what you should do step by step, you can handle this within this week:

Today: gather all correspondence from the last six months into a single folder, in chronological order. Put the contract next to it too.

Tomorrow: send a written email to the agency asking for three things — an up-to-date status report, a dated list of remaining tasks, and a copy of the current code and database. Be polite but clear.

If they reply: get the technical review Volkan Bey mentioned, then make your decision.

If they don't reply or try to brush you off: move to the formal notice stage Kemal Bey mentioned; at this point, you really need to work with a lawyer.

For some moral support: this situation is way more common than you think, and most cases get resolved without going to court. Stay calm, keep everything in writing, and take control of the process.

GGökhan A***Member
Job title
Manufacturer · furniture
Joined
Oct 2023
Message
74
#7

Thanks a lot, I sent the email asking for a written report yesterday, and they called today.

Here's what happened on our end: for the first time, they sent a real list, and it turned out most of the missing items were just waiting for our approval. So it's not entirely their fault, I'll be honest about that. Still, the fact that no one told us this for six months is a separate issue.

I'll also get the technical review done and post the results here.

MMeryem A***Member
Job title
Logistics planning
Sector
Electrical-electronics
Organization type
regional distributor
Joined
May 2023
Message
62
#8

This thread is archived.

OOnur M***Expert
Job title
Accounting clerk
Sector
Plastic
Organization type
medium-sized business
Joined
May 2023
Message
7
#9

The most overlooked point about delivery is this: Taking notes for two weeks yields better results than a six-month estimate.

This is my opinion, I'm not claiming it's absolute truth.

EEmine S***Member
Job title
Social media manager
Sector
Cosmetics
Organization type
8-person team
Joined
Sep 2024
Message
387
#10

I didn't know that.

MMeryem K***Member
Job title
Graphic Designer
Sector
Leather
Organization type
family business
Joined
Jul 2025
Message
417
#11

Good call starting this thread.

HHüseyin A***Member
Job title
Country Manager
Sector
Glass
Organization type
chain store
Joined
Jun 2023
Message
1
#12

I partly agree, partly disagree. Payment schedules should be tied to project phases not calendar dates.

Hope this helps.

MMert K***Member
Job title
Store associate
Sector
Energy
Organization type
sole proprietorship
Joined
Dec 2024
Message
304
#13

Timely topic.

ZZerrin K***MemberCommunity member
Joined
May 2025
Message
412
#14

Id appreciate it if you shared the outcome.

ŞŞerife D***Member
Job title
Accounting Manager
Sector
IT services
Organization type
boutique agency
Joined
Feb 2024
Message
101
#15

Noted, thanks.

BBora G***Expert
Job title
Product Manager
Sector
Healthcare services
Organization type
20-person company
Joined
Jul 2022
Message
292

Doki · Infrastructure migration · 2026

#16

I'm curious too.

KKORİDoki team
Job title
Forum moderator
Sector
Cybersecurity and digital
Organization type
Doki
Joined
Jan 2023
Message
2,840
Sentinel#17

For the record: the most common mistake in this area is relying on a single preventive measure. Go layer by layer — if one fails, the other stops it.

MMurat T***MemberCommunity member
Joined
Apr 2025
Message
53
#18

Let me clarify the technical side. The real issue isnt the number, but what its based on.

Everything goes well for the first three months; problems arise in the fourth.

TTaner Ö***ExpertCommunity member
Joined
Mar 2024
Message
16
#19

Same here.

EEsinMember
Job title
Career counselor
Joined
Jun 2024
Message
94

Doki · Interface design · 2026

#20

The opposite happened to me, that's why I'm writing. Start with a small trial; don't commit to everything at once.

Hope this helps.

Reply