How long does website design actually take? The agency says one month, but that feels way too long

GGülayMember
Job title
Textile workshop
Joined
Oct 2023
Message
84
#1

We partnered with a local digital agency to build a corporate website for our industrial packaging and supply company based in Riyadh. All we need is a basic 7-8 page bilingual (Arabic and English) brochure site; no payment gateway, no complex portal. The agency wants to write 30 business days into the contract for project completion—basically nearly a month and a half. We've set aside an 18,000 SAR budget for this.

To me, with modern tools and pre-made frameworks available, such a straightforward corporate site should go live in two weeks. Waiting a full month feels like lost time for business development and I'm worried the agency is just going to drag their feet.

I want to ask those who have managed this kind of project with an agency before: Why does a corporate web design process really take a month? Is the agency padding the timeline, or are there hidden phases we aren't factoring in?

CCansu P***MemberCommunity member
Joined
Mar 2024
Message
237
Most Helpful#2

Short answer: A one-month timeline from an agency is completely realistic and standard for a professional, bilingual corporate website. While the actual coding or page layout might only take a few days, content preparation, dual-language layout adjustments, revision rounds, and client sign-offs take up the bulk of the project timeline.

In corporate projects, time sinks almost never stem from coding; they come from approval workflows. In a typical roadmap, the first 5-7 days go to information architecture and wireframe approvals. The following 7-10 days are dedicated to visual mockups and design sign-offs. Developers won't write a line of code before designs are locked in, because late-stage visual changes force complete rewrites. In your case, because Arabic is RTL and English is LTR, every single layout basically has to be tested twice.

I strongly recommend building milestones into the contract. To keep things moving and track the agency, break the schedule down: 1) Information architecture and homepage wireframe approval, 2) Complete UI design delivery with English/Arabic copy, 3) Working staging build, 4) QA, form testing, and final launch sign-off. Cap client feedback windows at 2-3 days per milestone.

If you don't supply the copy, high-res product photos, and approved company profiles to the agency on day one, that one-month timeline will easily stretch to two, regardless of how fast the agency works. Rather than pressuring the agency, focus on having your own deliverables fully ready to hand over.

edit: typed from phone, sorry for typos.

OOkan G***Member
Job title
Finance Manager
Sector
Energy
Organization type
sole proprietorship
Joined
Apr 2023
Message
39
#3

Thirty business days is standard in Saudi Arabia, fast even. For bilingual sites, Arabic font readability and RTL layout bugs eat up serious hours. The agency isn't working solely on your account either; half that time goes into file transfers and waiting on revisions.

HHilal B***Veteran
Job title
Graphic Designer
Sector
Electrical-electronics
Organization type
regional distributor
Joined
Dec 2023
Message
17
#4

Just adapting the UI for Arabic is a whole separate workload on the CSS side. Form validation messages, mobile menu alignments, font sizing, and server-side redirects all require extra effort in bilingual setups. Even if coding takes 5 days, pushing to production without a staging environment would be a huge mistake.

GGürkan Y***Member
Job title
Secretary
Sector
Real estate
Organization type
300-person organization
Joined
Jun 2022
Message
85
#5

But do you actually have the Arabic and English copy ready to hand over to the agency right now, along with professional product photos? Most of the time when people complain that "the agency is so slow," it's because the client company took weeks to deliver the content.

NNeslihan T***Expert
Job title
Purchasing manager
Sector
Machinery manufacturing
Organization type
workshop
Joined
Dec 2024
Message
229
#6

To prevent delays, make sure these three clauses are in your contract: 1) Design revisions capped at 2 rounds, 2) Client feedback turnaround within a maximum of 3 business days, 3) Agency providing a written status report every Monday. These terms keep the process transparent.

VVildan D***Member
Job title
Quality control inspector
Sector
Electrical-electronics
Organization type
regional distributor
Joined
Apr 2024
Message
160

Doki · Phishing awareness training · 2024

#7

The real reason they said a month is because they're juggling five other projects at the same time. The actual time they spend working on your project probably won't exceed 35-40 hours total. If you don't set milestones, they won't even touch it until the last week and will rush it out in the final three days.

SSena S***MemberCommunity member
Joined
May 2023
Message
175
#8

had something similar done in riyadh last year. the agency that promised two weeks couldn't even deliver in two months. like anyone quoting a month will probably do it right at least they're being honest.

MMerve Ö***Expert
Job title
Technical service technician
Sector
Retail
Organization type
workshop
Joined
Oct 2022
Message
142
#9

Set up a meeting with the agency first thing tomorrow and ask for a weekly sprint schedule. Get a clear breakdown answering, "Which screens will we see on which Friday?" If they can't answer that, the timeline will drag on; if they give you a clear schedule, a month is reasonable.

MMustafa G***Member
Job title
Purchasing manager
Sector
Furniture manufacturing
Organization type
medium-sized business
Joined
Dec 2022
Message
72
#10

At my first company I thought "come on, this can be done in a week" and had a site built on an off-the-shelf theme. The Arabic menus aligned to the left, the English fonts showed up as broken squares in Arabic and form submissions went straight to spam instead of the client. I ended up having another agency rebuild it from scratch and wasted two months. Trust me waiting a month is a cheap lesson.

PPelin D***Expert
Job title
Finance Manager
Organization type
early-stage startup
Joined
Nov 2023
Message
138
#11

The delivery terms in the contract must clearly define both parties' responsibilities. Just as with the agency's late delivery penalties, how delays in your company's approval processes will impact the timeline should also be documented in writing.

EErcan B***MemberCommunity member
Joined
Sep 2023
Message
140
#12

My perspective changed after experiencing that. Hasty decisions become decisions you have to fix six months later.

Every "we'll look at it later" in a meeting means unbilled work. If you post the result here, it will help others too.

YYiğit V***Member
Job title
Graphic Designer
Sector
Cosmetics
Organization type
two-branch business
Joined
Aug 2024
Message
180
#13

There is something to watch out for. If code ownership isn't in the contract, you have no bargaining power when leaving.

If scope grows, either time or budget must grow. There is no third option. Hope this helps.

BBeyza A***Member
Job title
Field sales representative
Sector
Electrical-electronics
Organization type
sole proprietorship
Joined
Feb 2026
Message
61
#14

I feel the same way. If it's your first time, start small; scaling comes later.

That's all, sorry if I went on too long.

SSelim C***MemberCommunity member
Joined
Nov 2025
Message
53
#15

There's also a measurement aspect to this. People defend habits, not processes. Resistance comes from there.

Implementing a change request process doesn't slow things down, it speeds them up.

ÖÖzgür V***MemberCommunity member
Joined
Apr 2024
Message
228
#16

Let me write how it's done in practice. Everything goes well for the first three months; problems arise in the fourth.

Correct me if I'm wrong.

AAlper B***MemberCommunity member
Joined
Jul 2022
Message
304
#17

I'd appreciate it if you shared the outcome.

SSevgi D***Member
Job title
Boutique owner
Joined
Jun 2024
Message
92
#18

Im curious too.

TTaner V***MemberCommunity member
Joined
Jan 2023
Message
307
#19

We need to make a distinction here. Weekly written progress reports are much more useful than asking for dates.

Trying to do this alone is the most expensive way. Correct me if I'm wrong.

FFiliz B***VeteranCommunity member
Joined
Sep 2024
Message
3
#20

Three different views emerged, they all complement each other. When making a decision, first look at what data you have on hand.

If I were you, I'd go this route.