forumNew topic

We got a quote for a corporate website, but what does it include and is it really necessary for us?

MMelis Y***Member
Job title
Operations manager
Sector
Plastic
Organization type
8-person team
Joined
Jan 2023
Message
403
#1

We supply industrial valves and pipe fittings with our team of 8 in Ankara Ostim. We do wholesale to factories and contracting firms, with zero sales to retail end-consumers. Currently, we have a very outdated one-page site dating back to 2017 that only lists our address and product categories.

We met with a digital agency last week. They gave us a proposal for 65.000 TL + KDV under the name "Corporate Website Design and Infrastructure Revamp." The proposal includes items like UI/UX design, custom admin panel, corporate identity integration SEO infrastructure and multilingual content management.

We don't sell products directly online with credit cards. For a small B2B wholesale business like ours, what exactly does a "corporate website" mean? Which of these items in the quote are actually essential for us, and which ones are just unnecessary cost inflation?

PPerihan M***MemberCommunity member
Joined
Apr 2024
Message
83
Most Helpful#2

Short answer: A corporate website is a digital storefront that builds trust by presenting the corporate identity, technical expertise, references, and product catalogs of businesses that do not process direct online payments to potential partners. For a B2B firm like yours, it's an indispensable sales tool that makes procurement managers at new factories take you seriously before drawing up specs; however, not every fancy module an agency tacks onto a quote is necessary for your scale.

Let's break down the items in the quote: Your absolute must-haves are mobile responsiveness, fast-loading server infrastructure, a PDF-supported product catalog where your clients can view product dimensions and technical drawings, and direct request-for-quote forms. Search engine optimization infrastructure is also an absolute necessity so local buyers searching for valves and fittings can find you.

On the other hand, items like custom UI design and a custom admin panel coded from scratch are typical line items that multiply costs at a small scale. Adapting a quality B2B template onto a proven open-source content management system instead of having custom code written from scratch will cut the cost in half. Also, unless you are actively exporting overseas, multilingual infrastructure is an unnecessary extra expense at this stage.

In market terms, 65.000 TL isn't unreasonable in today's conditions if it involves custom design and custom software developed from scratch; however, it's too high for an 8-10 page catalog site of this scale if it's just going to be an off-the-shelf template built on an open-source platform. I'd suggest asking the agency outright what the admin panel will be, who will handle content entry, and what the source code handover terms look like.

ZZafer D***Member
Job title
Operations manager
Sector
Tourism
Organization type
8-person team
Joined
Nov 2024
Message
15
#3

We're in a similar line of business in Ostim. We had a corporate site built for 38.000 TL in late 2023. The agency initially pitched us a 70k custom panel package too; once we switched to a standard CMS and dropped the foreign language module, the price immediately dropped to 38k, and it was delivered in two weeks.

DDamla K***MemberCommunity member
Joined
Aug 2025
Message
1
#4

Have them revise the quote: take out the multilingual support and the custom design from scratch. Have them add a clean product catalog a quick quote button, and a technical specs download area instead. The price will instantly drop down to the 35.000 - 45.000 TL range.

AAyşegülMember
Job title
Boutique hotel
Organization type
workshop
Joined
Aug 2024
Message
86
#5

When a factory buyer visits your site they don't care about flashy animations. They look at whether there's a technical spec sheet, what the SKU is, and if they can download the technical drawings... Skip the agency's bells and whistles and go for a simple layout that showcases your technical catalog clearly.

DDamla T***MemberCommunity member
Joined
Aug 2023
Message
95
#6

steer clear if they say they're building a custom panel. if you ever fight and part ways with the agency down the road no other dev will be able to touch the site and you'll be locked in.

MMustafa A***Member
Job title
Regional Manager
Sector
Paper
Organization type
cooperative
Joined
Mar 2023
Message
37
#7

Make sure to clarify these 3 points in writing before signing any contract: 1) The domain and hosting will be registered under your company's name, 2) The agency will handle uploading the product photos and technical documents into the system, 3) Free bug support will be provided for at least 6 months after the site goes live.

İİlknur O***Member
Job title
Courier coordinator
Sector
Livestock
Organization type
chain store
Joined
Feb 2025
Message
109
#8

"Corporate" is the easiest way to double the price in the agency world. There are tons of agencies that claim custom software in the proposal but just set up a standard open-source template behind the scenes. Don't pay a single cent before clarifying what the underlying stack is in the contract.

HHalil T***VeteranCommunity member
Joined
Oct 2023
Message
47
#9

I recommend reviewing the copyright and intellectual property clauses in the proposal. It must be explicitly stated in the contract that upon project completion, all source code, graphic assets, and administrative access rights for the site will be transferred to your company.

GGizem U***MemberCommunity member
Joined
Oct 2023
Message
55
#10

what exactly does this admin panel do? like like when we bring in a new valve model tomorrow will we be able to add the product to the site ourselves without paying the agency?

FFiliz Ö***Member
Job title
Operations manager
Sector
Seafood
Organization type
8-person team
Joined
Sep 2024
Message
383
#11

this thread is archived and ask who prepared the quote and who will actually do the work.

in legacy systems, the most expensive thing is unknown dependencies then anyway correct me if I'm wrong.

NNeslihan T***Expert
Job title
Purchasing manager
Sector
Machinery manufacturing
Organization type
workshop
Joined
Dec 2024
Message
229
#12

I went through the same thing.

EEmine Y***ExpertCommunity member
Joined
Apr 2024
Message
7
#13

I was thinking the same thing. Code without setup documentation isn't yours even if you have it.

If you get three different answers on a topic, the question was asked wrong. Correct me if I'm wrong.

OOrhanMember
Job title
IT company
Joined
Oct 2023
Message
132

Doki · Vulnerability scanning · 2026

#14

I agree with this. If acceptance criteria aren't written, when the work is done is open to debate.

Just leaving this note, it might be useful.

DDilara B***Member
Job title
Operations manager
Sector
Furniture manufacturing
Organization type
regional distributor
Joined
Jun 2024
Message
1

Doki · Interface design · 2024

#15

The discussion got scattered, let me summarize. Every "we'll look at it later" in a meeting means unbilled work.

That's all, sorry if I went on too long.

LLevent S***MemberCommunity member
Joined
Nov 2024
Message
5
#16

heres how it went for us but honestly the harder it is to reverse a decision the slower you should make it.

the real issue isn't the number, but what it's based on. anyway i'm also curious if anyone does it differently.

NNecati T***ExpertCommunity member
Joined
Oct 2024
Message
50
#17

Correct.

KKaan G***ExpertCommunity member
Joined
Jun 2023
Message
94
#18

I feel the same way. Code without setup documentation isnt yours, even if you have it.

Mistakes made on the what is a corporate website side are usually reversible but expensive... tbh correct me if Im wrong.

TTolga C***MemberCommunity member
Joined
Oct 2024
Message
97
#19

If I understood correctly, you're saying: Any unwritten clause becomes a point of disagreement later, as both sides remember it differently.

If you post the result here, it will help others too.

AAhmet B***MemberCommunity member
Joined
Jan 2023
Message
280
#20

Let me speak from the other side; I'm on the supplier side. If you get three different answers on a topic, the question was asked wrong.

Proven by experience.

Reply